Des Moines Creek Trail
Multi-Use Trails
The Des Moines Creek Trail starts on Puget Sound and follows the creek and canyon through a forest to the end of the SeaTac runway.
It is next to the Des Moines pier, which is not open to cycling,
but makes a good stroll to combine with your ride.
The trail is smooth and well maintained,
with a gradual climb throughout its length.
An offroad option is located near the top of the trail.
The end of the trail is also the end of the SeaTac runway.