As the first of the branch refrigeration staff I was asked to give continuous feedback on the equipment. I also made several trips to other branches to train (and train with) other technicians and production personnel.

I also installed racking, saunas, built complete turnkey cellars, modified existing installations and ran part of the shop.












Carpentry

General refrigeration system build/installs

DX Issues and General Feedback

WhisperKool Issues

Chiller issues and and replacements

Training





















































































Carpentry


glove cover

Price

Rei

Dell complete

Wind





Top of this document



















































































General refrigeration system build/installs


chn

Fos

gts

Zek





Top of this document



















































































Chiller issues and and replacements


Clrk

Bun

Cam-chiller

Cam-dx (request only)

Fer







Top of this document



















































































DX Issues and General Feedback


29 ser ship damage

Beasley fits.

Dell

Ein-Law Issue

MCCN

Neil issues

Sor issues and build

Staple Damage

to-bill-et-al-6-10-2008----Request only.





Top of this document



















































































WhisperKool Issues


grnbr2 damage

Wind wisp failure





Top of this document



















































































Training


Bad Bush

ELK Wall Transformer

Slotting Holes

Strapping EPR valves

RJ-11 crimping

A small metering problem.

Brazeing





Top of this document








































































tumblr page counter